Intake Start (SDLC)
Purpose
IMPORTANT: This command is for teams who have manually crafted their own intake documents (project-intake.md, solution-profile.md, option-matrix.md) and want to validate them before starting the SDLC process.
If you need to generate intake documents, use one of these instead:
/intake-wizard "description"- Generate intake from scratch with interactive guidance/intake-from-codebase .- Generate intake by analyzing existing codebase
This command is NOT required if you used intake-wizard or intake-from-codebase - those commands produce complete, validated intake forms ready for the next phase.
Task
Given existing, manually-created Project Intake documents:
- Process guidance from user prompt (if provided) to tailor analysis
- Validate required fields and note gaps
- Generate or update phase-plan-inception.md and risk-list.md
- Recommend initial ADRs and agent assignments
- Hand off to Executive Orchestrator to start Concept → Inception flow
Parameters
<path-to-intake-folder-or-form>(required): Path to intake directory (default:.aiwg/intake/)--guidance "text"(optional): User-provided context to guide inception planning
Guidance Parameter Usage
The --guidance parameter accepts free-form text to help tailor the Inception phase planning. Use it for:
Process Focus:
/intake-start .aiwg/intake/ --guidance "Focus on security architecture first, compliance is critical path"
Risk Priorities:
/intake-start .aiwg/intake/ --guidance "Third-party API integration is biggest unknown, needs spike ASAP"
Team Constraints:
/intake-start .aiwg/intake/ --guidance "Team has limited DevOps experience, need extra support for infrastructure setup"
Stakeholder Expectations:
/intake-start .aiwg/intake/ --guidance "Executive demo required in 2 weeks, need working prototype for fundraising"
Technical Unknowns:
/intake-start .aiwg/intake/ --guidance "Performance at scale unproven, need load testing POC before committing to architecture"
How guidance influences planning:
- Prioritizes specific risks based on guidance (e.g., "API integration" → elevate integration risks)
- Tailors agent assignments (e.g., "limited DevOps" → assign DevOps Engineer + provide training resources)
- Adjusts phase plan (e.g., "demo in 2 weeks" → front-load UI prototype tasks)
- Highlights critical path items (e.g., "compliance critical" → security gates moved earlier)
- Documents in phase-plan-inception.md (captures strategic focus and constraints)
- Recommends spikes/POCs based on unknowns mentioned in guidance
Inputs
project-intake.md(filled) - Comprehensive system documentation with metadata, architecture, scale, security, team detailssolution-profile.md(filled) - Current profile characteristics, improvement roadmap, risk mitigation, key decisionsoption-matrix.md(filled) - 6-step framework application analysis with priorities and trade-offs
Outputs
phase-plan-inception.md- Tailored inception plan based on validated intakerisk-list.md- Prioritized risks with mitigation strategiesagent-assignments.md- Recommended agent assignments based on project characteristics
Workflow
Step 1: Read and Process Guidance
If --guidance parameter provided:
- Extract guidance text from user prompt
- Document guidance in notes for later use
- Use guidance to prioritize validation checks (e.g., "security critical" → focus security validation)
Step 2: Locate and Read Intake Documents
Default location: .aiwg/intake/ (or user-provided path)
Required files:
project-intake.mdsolution-profile.mdoption-matrix.md
Error handling:
- If path is a directory, look for files within it
- If path is a single file, read it and look for other files in same directory
- If files missing, report which ones and stop (cannot proceed without complete intake)
Step 3: Validate Project Intake (Comprehensive)
Critical sections to validate (from new comprehensive template):
Metadata Validation
- Project name present
- Requestor/owner identified
- Date present
- Stakeholders listed (minimum: Engineering, Product)
System Overview Validation
- Purpose clearly stated (1-2 sentences minimum)
- Current Status specified (Planning/Development/Early Users/Production)
- Users defined (count, personas, or description)
- Tech Stack documented:
- Languages specified
- Frontend (if applicable)
- Backend (if applicable)
- Database specified
- Deployment approach specified
Problem and Outcomes Validation
- Problem statement present (for existing systems) OR goal statement (for greenfield)
- Outcomes defined (success criteria, key results)
Current Scope and Features Validation
- Feature list present (minimum 1 feature for MVP+, 3+ for Production)
- Features categorized or prioritized
Architecture Validation
- Architectural style specified (monolith/microservices/serverless/etc.)
- Major components listed (minimum 2-3 for Production+)
- Data models documented (at least high-level entities)
- Integration points identified (external APIs, third-party services)
Scale and Performance Validation
- Expected user capacity documented (even if estimate)
- Active users estimate provided
- Performance characteristics specified (response times, throughput, etc.)
Security and Compliance Validation
- Security posture stated (Minimal/Baseline/Strong/Enterprise)
- Data classification documented (if handling user data)
- Security controls listed (authentication, authorization, etc.)
- Compliance requirements specified (if any: GDPR, HIPAA, SOC2, etc.)
Team and Operations Validation
- Team size documented (minimum: developer count)
- Current velocity/cadence noted (for existing teams)
- Process maturity described (trunk-based, PR workflow, CI/CD, etc.)
- Operational support plan outlined (on-call, monitoring, etc.)
Dependencies and Infrastructure Validation
- Third-party services listed (all critical external dependencies)
- Infrastructure details specified (cloud provider, regions, etc.)
Known Issues and Technical Debt Validation
- Known risks documented (even if "none identified yet")
- Technical debt acknowledged (if existing system)
Why This Intake Now? Validation
- Context provided (why starting SDLC process now)
- Goals clearly stated
- Triggers identified (timeline, funding, user need, etc.)
Gap Handling:
- For critical gaps (no purpose, no tech stack, no team size): STOP and request user fill gaps
- For moderate gaps (missing performance estimates, unclear compliance): WARN and note in phase plan
- For minor gaps (missing optional sections): NOTE in validation summary
Step 4: Validate Solution Profile (Comprehensive)
Critical sections to validate (from new comprehensive template):
Profile Selection Validation
- Profile chosen (Prototype/MVP/Production/Enterprise)
- Selection rationale provided (explains why this profile fits)
Current State Characteristics Validation
Security:
- Posture specified (Minimal/Baseline/Strong/Enterprise)
- Controls present documented
- Gaps identified
- Recommendation provided
Reliability:
- Current SLOs documented (or "N/A" for non-services)
- Availability targets specified
- Monitoring maturity described
- User priority noted (from option-matrix)
- Recommendation provided (investment areas)
Testing & Quality:
- Test coverage documented (current percentage)
- Test types detected/planned
- Quality gates specified
- User priority noted
- Recommendation provided (testing strategy)
Process Rigor:
- SDLC adoption level documented
- Code review process described
- Documentation status assessed
- Recommendation provided (process improvements)
Recommended Profile Adjustments Validation
- Current profile stated
- Recommended profile specified
- Transition plan outlined (phases with actions and timelines)
Improvement Roadmap Validation
- Phase 1 (Immediate) defined with critical gaps
- Phase 2 (Short-term) defined with important improvements
- Phase 3 (Long-term) defined with strategic improvements
- Each phase includes: rationale, success metrics
Risk Mitigation Validation
- Top 3-5 risks identified with:
- Risk description
- Impact level (HIGH/MEDIUM/LOW)
- Mitigation strategies
- Timeline for mitigation
Key Decisions Needed Validation
- Critical decisions documented (minimum 1-3 for Production+)
- Each decision includes:
- Question framing
- Options (2-3 alternatives)
- Recommendation
- Timeline for decision
Gap Handling:
- For critical gaps (no profile, no improvement roadmap): STOP and request completion
- For moderate gaps (missing risk mitigation, unclear decisions): WARN and elevate in phase plan
- For minor gaps (incomplete success metrics): NOTE in validation summary
Step 5: Validate Option Matrix (Comprehensive)
Critical sections to validate (from new 6-step template):
Step 1: Project Reality Validation
- What IS This Project? - Clear description (2-3 sentences minimum)
- Audience & Scale - Target users and scale documented
- Deployment & Infrastructure - Deployment model specified
- Technical Complexity - Complexity assessment provided
Step 2: Constraints & Context Validation
- Resources - Team size, timeline, budget constraints documented
- Regulatory & Compliance - Requirements specified (or "None")
- Technical Context - Legacy systems, existing infrastructure noted
Step 3: Priorities & Trade-offs Validation (CRITICAL)
- Priority Weights table present
- Weights sum to 1.0 (verify mathematically)
- Each criterion has rationale:
- Delivery Speed (0.10-0.50)
- Cost Efficiency (0.10-0.40)
- Quality/Security (0.10-0.50)
- Reliability/Scale (0.10-0.40)
- Trade-off context provided (explains hard choices)
Priority validation is CRITICAL because it drives:
- Phase plan task prioritization
- Agent assignment decisions
- Quality gate thresholds
- Risk tolerance levels
Step 4: Intent & Decision Context Validation (CRITICAL)
- Why This Intake Now? - Clearly stated (business/technical triggers)
- What decisions need making? - Key decisions identified
- What's uncertain? - Unknowns acknowledged
Intent validation is CRITICAL because it shapes:
- Phase plan focus areas
- Spike/POC recommendations
- Early ADR topics
Step 5: Framework Application Validation
- Templates - Checked boxes for applicable templates (or explicit "NONE")
- Commands - Checked boxes for applicable commands
- Agents - Checked boxes for applicable agents
- Process Rigor Level - Specified (Minimal/Moderate/Full/Enterprise)
- Rationale - Explains why these components selected
Step 6: Evolution & Adaptation Validation
- Expected Changes - Documented (team growth, feature expansion, etc.)
- Adaptation Triggers - Specified (when to revisit framework choices)
- Planned Framework Evolution - Outlined (how framework will evolve with project)
Architectural Options Analysis Validation (Optional but Recommended)
- Option A documented (if applicable)
- Option B documented (if applicable)
- Option C documented (if applicable)
- Recommendation provided with rationale
Gap Handling:
- For critical gaps (no Step 3 weights, no Step 4 intent): STOP and request completion
- For moderate gaps (missing Step 6, incomplete rationale): WARN and use defaults
- For minor gaps (no architectural options): NOTE (optional section)
Step 6: Generate Validation Summary
Create structured validation report:
# Intake Validation Summary
**Validation Date**: {current date}
**Intake Path**: {path to intake directory}
**Guidance Provided**: {yes/no, summary if provided}
## Completeness Assessment
**Project Intake**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}
**Solution Profile**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}
**Option Matrix**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}
## Readiness for Inception
**Status**: {READY | NEEDS COMPLETION | BLOCKED}
**Recommendation**:
- {If READY: proceed to phase planning}
- {If NEEDS COMPLETION: list required actions}
- {If BLOCKED: explain blockers and resolution steps}
## Key Insights from Intake
**Project Profile**: {Prototype/MVP/Production/Enterprise}
**Top Priority**: {from Step 3 weights}
**Biggest Risk**: {from solution-profile risk mitigation}
**Critical Decision**: {from solution-profile key decisions}
## Next Steps
1. {action 1}
2. {action 2}
3. {action 3}
Decision point:
- If READY: Proceed to Step 7 (Generate Phase Plan)
- If NEEDS COMPLETION: Output validation summary and STOP (user must complete intake)
- If BLOCKED: Output validation summary with resolution steps and STOP
Step 7: Generate Phase Plan (Inception)
Create phase-plan-inception.md based on validated intake:
Structure:
# Phase Plan: Inception
**Project**: {from project-intake metadata}
**Profile**: {from solution-profile}
**Generated**: {current date}
**Guidance Applied**: {summary of --guidance if provided}
## Phase Overview
**Duration**: {estimate based on profile: Prototype=1-2 weeks, MVP=2-4 weeks, Production=4-6 weeks, Enterprise=6-8 weeks}
**Team Size**: {from project-intake team section}
**Primary Focus**: {derived from option-matrix Step 4 intent}
## Phase Goals
1. **Architectural Foundation**: {from solution-profile improvement roadmap Phase 1}
2. **Risk Retirement**: {from solution-profile risk mitigation top risks}
3. **Team Alignment**: {from project-intake team section}
4. **Decision Making**: {from solution-profile key decisions}
## Priority-Driven Focus
**Top Priority** (from option-matrix Step 3): {highest weighted criterion}
**Implication**: {explain how this priority shapes Inception tasks}
**Examples**:
- If **Reliability/Scale** is top priority → focus architecture scalability, load testing POC, SLO definition
- If **Quality/Security** is top priority → focus security architecture, threat modeling, compliance review
- If **Delivery Speed** is top priority → focus MVP scope definition, technical spikes, rapid prototyping
- If **Cost Efficiency** is top priority → focus cloud cost modeling, resource optimization, vendor selection
## Key Activities (Tailored to Intake)
### Week 1: Foundation
- [ ] Kick-off meeting with stakeholders (from project-intake stakeholders list)
- [ ] Architecture baseline (from project-intake architecture section)
- [ ] Risk register initialization (from solution-profile risk mitigation)
- [ ] Tool and environment setup (from project-intake tech stack)
### Week 2-3: Exploration and Decision Making
- [ ] {activity 1 from solution-profile improvement roadmap Phase 1}
- [ ] {activity 2 from solution-profile key decisions}
- [ ] {spike/POC recommendation if guidance or option-matrix Step 4 mentions unknowns}
- [ ] Initial ADRs (see recommendations below)
### Week 4: Closure and Handoff
- [ ] Architecture review (validate against option-matrix architectural options)
- [ ] Risk reassessment (update risk-list.md)
- [ ] Inception gate check (validate readiness for Elaboration)
- [ ] Handoff to Elaboration (prepare phase-plan-elaboration.md)
## Risks and Mitigation (From Solution Profile)
{Pull top 3-5 risks from solution-profile risk mitigation section}
**Risk 1**: {risk name}
- **Impact**: {HIGH/MEDIUM/LOW}
- **Mitigation**: {strategies from solution-profile}
- **Timeline**: {when to address}
**Risk 2**: {risk name}
- **Impact**: {HIGH/MEDIUM/LOW}
- **Mitigation**: {strategies from solution-profile}
- **Timeline**: {when to address}
{...additional risks}
## Critical Decisions (From Solution Profile)
{Pull from solution-profile key decisions section}
**Decision 1**: {decision question}
- **Options**: {list 2-3 alternatives}
- **Recommendation**: {from solution-profile}
- **Deadline**: {when decision must be made}
- **Owner**: {assign based on decision type}
**Decision 2**: {decision question}
- **Options**: {list 2-3 alternatives}
- **Recommendation**: {from solution-profile}
- **Deadline**: {when decision must be made}
- **Owner**: {assign based on decision type}
{...additional decisions}
## Guidance Integration
{If --guidance provided, document how it influenced this phase plan}
**Guidance Provided**: "{verbatim guidance text}"
**Impact on Phase Plan**:
- {specific adjustment 1 based on guidance}
- {specific adjustment 2 based on guidance}
- {specific adjustment 3 based on guidance}
**Examples**:
- Guidance: "Security architecture first" → Moved threat modeling to Week 1, assigned Security Architect early
- Guidance: "API integration biggest unknown" → Added integration spike to Week 2, elevated API risks
- Guidance: "Team has limited DevOps experience" → Added DevOps Engineer + training resources to agent assignments
## Success Criteria
**Inception complete when**:
1. Architecture baseline documented (ADRs approved)
2. Top 3 risks retired or mitigated
3. Critical decisions resolved
4. Team aligned on approach
5. Inception gate passed (ready for Elaboration)
## Next Phase
**Handoff to**: Elaboration
**Trigger**: Inception gate passed
**Preparation**: Update risk-list.md, generate phase-plan-elaboration.md
Key tailoring points:
- Duration scales with profile (Prototype fast, Enterprise slow)
- Activities pulled from solution-profile improvement roadmap Phase 1
- Risks pulled from solution-profile risk mitigation
- Decisions pulled from solution-profile key decisions
- Guidance explicitly integrated and documented
- Priority focus derived from option-matrix Step 3 weights
Step 8: Generate Risk List
Create risk-list.md based on solution-profile risk mitigation:
Structure:
# Risk List
**Project**: {from project-intake metadata}
**Generated**: {current date}
**Last Updated**: {current date}
## Active Risks
{For each risk from solution-profile risk mitigation section}
### Risk #{n}: {Risk Name}
**Category**: {Technical | Process | Resource | External | Compliance}
**Impact**: {HIGH | MEDIUM | LOW}
**Probability**: {HIGH | MEDIUM | LOW}
**Status**: {Identified | Analyzing | Mitigating | Monitoring | Retired}
**Description**: {from solution-profile}
**Impact if Realized**: {from solution-profile impact description}
**Mitigation Strategies**:
1. {strategy 1 from solution-profile}
2. {strategy 2 from solution-profile}
3. {strategy 3 from solution-profile}
**Timeline**: {from solution-profile mitigation timeline}
**Owner**: {assign based on risk category}
**Last Review**: {current date}
---
{Repeat for all risks from solution-profile}
## Risk Register Summary
| ID | Risk Name | Impact | Probability | Status | Owner |
|----|-----------|--------|-------------|--------|-------|
| R1 | {name} | {H/M/L} | {H/M/L} | {status} | {owner} |
| R2 | {name} | {H/M/L} | {H/M/L} | {status} | {owner} |
| ... | ... | ... | ... | ... | ... |
## Risk Burn-down Target
**Inception Phase Goal**: Retire or mitigate top 3 risks
**Elaboration Phase Goal**: Retire or mitigate remaining HIGH risks
**Construction Phase Goal**: Monitor and address emerging risks
**Transition Phase Goal**: All HIGH risks retired or accepted
## Next Review
**Date**: {1-2 weeks from current date}
**Trigger**: Weekly risk review meeting OR significant risk event
Categorization logic:
- Technical: Architecture, technology choice, integration, performance, scalability
- Process: Team coordination, code review, testing, deployment
- Resource: Team size, skill gaps, timeline, budget
- External: Third-party dependencies, vendor reliability, API changes
- Compliance: Regulatory requirements, security posture, data protection
Owner assignment logic:
- Technical risks → Architecture Designer or Component Owner
- Process risks → Project Manager or Executive Orchestrator
- Resource risks → Project Manager or Vision Owner
- External risks → Integration Engineer or API Designer
- Compliance risks → Security Architect or Legal Liaison
Step 9: Generate Agent Assignments
Create agent-assignments.md based on option-matrix Step 5 framework application:
Structure:
# Agent Assignments (Inception Phase)
**Project**: {from project-intake metadata}
**Profile**: {from solution-profile}
**Generated**: {current date}
## Assignment Strategy
**Process Rigor Level**: {from option-matrix Step 5}
**Team Size**: {from project-intake team section}
**Priority Focus**: {from option-matrix Step 3 top weight}
## Core Agents (Always Assigned)
### Executive Orchestrator
**Role**: Lifecycle coordination, gate enforcement, artifact synchronization
**Priority Tasks**:
- Orchestrate Inception phase activities
- Enforce Inception gate criteria
- Coordinate agent handoffs
### Vision Owner
**Role**: Product vision alignment, requirement validation
**Priority Tasks**:
- Validate project-intake alignment with business goals
- Review architectural options against vision
- Approve critical decisions
### Architecture Designer
**Role**: System architecture, technical direction
**Priority Tasks**:
- {from solution-profile improvement roadmap Phase 1 architecture tasks}
- Document ADRs (see recommendations below)
- Review architectural options from option-matrix
## Priority-Driven Agents
{Based on option-matrix Step 3 top priority}
**If Reliability/Scale is top priority**:
- **Reliability Engineer**: Establish SLO/SLI, capacity planning
- **Performance Engineer**: Baseline performance, bottleneck identification
- **DevOps Engineer**: Infrastructure design, monitoring setup
**If Quality/Security is top priority**:
- **Security Architect**: Threat modeling, security requirements
- **Security Gatekeeper**: Security gate criteria, compliance validation
- **Code Reviewer**: Code review standards, quality gates
**If Delivery Speed is top priority**:
- **Software Implementer**: Rapid prototyping, MVP development
- **Test Engineer**: Fast feedback loops, smoke tests
- **Toolsmith**: Developer experience, automation tooling
**If Cost Efficiency is top priority**:
- **Cloud Architect**: Cost modeling, resource optimization
- **DevOps Engineer**: Infrastructure efficiency, right-sizing
- **Integration Engineer**: Vendor selection, API cost analysis
## Risk-Driven Agents
{Based on solution-profile risk mitigation top risks}
**Risk**: {risk 1 name}
**Agent**: {appropriate agent for this risk category}
**Tasks**:
- {mitigation strategy 1}
- {mitigation strategy 2}
**Risk**: {risk 2 name}
**Agent**: {appropriate agent for this risk category}
**Tasks**:
- {mitigation strategy 1}
- {mitigation strategy 2}
{...additional risk-driven assignments}
## Guidance-Driven Agents
{If --guidance provided, assign agents based on guidance context}
**Guidance**: "{verbatim guidance text}"
**Agent Assignments**:
- {agent 1 assigned because of guidance}
- {agent 2 assigned because of guidance}
**Examples**:
- Guidance: "Limited DevOps experience" → Assign DevOps Engineer + provide training resources
- Guidance: "Security critical path" → Assign Security Architect + Security Gatekeeper early
- Guidance: "API integration biggest unknown" → Assign Integration Engineer + API Designer for spike
## Framework-Driven Agents (From Option Matrix Step 5)
{Based on option-matrix Step 5 checked boxes}
**Checked Agents** (from option-matrix):
- {agent 1 from option-matrix rationale}
- {agent 2 from option-matrix rationale}
- {agent 3 from option-matrix rationale}
**Rationale**: {from option-matrix Step 5 rationale section}
## Assignment Timeline
**Week 1** (Inception kickoff):
- Executive Orchestrator (immediate)
- Vision Owner (immediate)
- Architecture Designer (immediate)
**Week 2** (Risk and decision focus):
- {priority-driven agents}
- {risk-driven agents}
**Week 3-4** (As needed):
- {additional agents based on emerging needs}
## Handoff to Elaboration
**Agents continuing into Elaboration**:
- Executive Orchestrator (lifecycle coordination)
- Architecture Designer (architecture evolution)
- {priority-driven agents that remain relevant}
**Agents completing in Inception**:
- {agents whose work ends after Inception}
**New agents for Elaboration**:
- {agents not needed until Elaboration phase}
Agent selection logic:
- Core agents (always): Executive Orchestrator, Vision Owner, Architecture Designer
- Priority-driven (from option-matrix Step 3 weights): Match top priority to specialized agents
- Risk-driven (from solution-profile risks): Assign agents who can mitigate specific risks
- Guidance-driven (from --guidance parameter): Assign agents mentioned or implied by guidance
- Framework-driven (from option-matrix Step 5): Assign checked agents from framework application
Step 10: Generate Initial ADR Recommendations
Within phase-plan-inception.md, include section:
## Recommended Initial ADRs
{Based on project-intake architecture section, option-matrix architectural options, and solution-profile key decisions}
**ADR-001**: {Decision title from option-matrix architectural options recommendation}
- **Context**: {from option-matrix Step 1 project reality}
- **Decision**: {from option-matrix architectural options recommendation}
- **Rationale**: {from option-matrix recommendation rationale}
- **Status**: Proposed (to be reviewed in Week 2)
**ADR-002**: {Decision title from solution-profile key decisions}
- **Context**: {from solution-profile decision question}
- **Decision**: {from solution-profile recommendation}
- **Rationale**: {from solution-profile recommendation}
- **Status**: Proposed (to be reviewed in Week 2-3)
{Additional ADRs based on guidance or high-impact risks}
**Guidance**: If guidance mentions specific technical decisions or unknowns, recommend ADRs to address them.
Step 11: Summary and Handoff
Output summary message to user:
# Intake Start Complete
✅ **Validation**: All intake documents validated
✅ **Phase Plan**: phase-plan-inception.md generated
✅ **Risk List**: risk-list.md generated
✅ **Agent Assignments**: agent-assignments.md generated
## Key Insights
**Project**: {name}
**Profile**: {profile}
**Top Priority**: {priority}
**Biggest Risk**: {risk}
**Critical Decision**: {decision}
## Generated Artifacts
1. `phase-plan-inception.md` - {file size} KB
2. `risk-list.md` - {file size} KB
3. `agent-assignments.md` - {file size} KB
## Next Steps
1. **Review** generated artifacts (ensure alignment with expectations)
2. **Adjust** if needed (especially if guidance interpretation missed nuances)
3. **Execute** Inception phase using `flow-concept-to-inception` command
4. **Coordinate** with assigned agents (Executive Orchestrator will orchestrate)
## Ready to Start?
To begin Inception phase execution:
```bash
/flow-concept-to-inception .aiwg/
This will activate the Executive Orchestrator and assigned agents to begin Inception activities.
## Error Handling
### Missing Files
- If project-intake.md missing: **STOP** - "Cannot proceed without project-intake.md. Please run /intake-wizard or /intake-from-codebase first."
- If solution-profile.md missing: **STOP** - "Cannot proceed without solution-profile.md. Please complete intake generation first."
- If option-matrix.md missing: **WARN** - "option-matrix.md missing. Will use defaults for priorities and framework application."
### Incomplete Sections
- If critical gaps found: **STOP** with validation summary - user must complete gaps before proceeding
- If moderate gaps found: **WARN** in validation summary - proceed with noted gaps
- If minor gaps found: **NOTE** in validation summary - proceed normally
### Conflicting Information
- If project-intake and solution-profile conflict (e.g., different team sizes): **WARN** and use project-intake as source of truth
- If option-matrix and solution-profile priorities conflict: **WARN** and use option-matrix Step 3 weights as source of truth
### Invalid Data
- If option-matrix Step 3 weights don't sum to 1.0: **STOP** - "Priority weights must sum to 1.0. Current sum: {calculated sum}. Please fix option-matrix.md."
- If profile not one of (Prototype/MVP/Production/Enterprise): **STOP** - "Invalid profile: {profile}. Must be one of: Prototype, MVP, Production, Enterprise."
## Best Practices
1. **Always validate before generating** - Don't generate phase plans from incomplete intake
2. **Leverage guidance parameter** - Use guidance to prioritize and tailor (don't ignore user's strategic intent)
3. **Be explicit about gaps** - Don't silently fill gaps with assumptions (warn user and document)
4. **Cross-reference documents** - Pull risks from solution-profile, priorities from option-matrix, architecture from project-intake
5. **Tailor to profile** - Prototype gets lightweight plan, Enterprise gets comprehensive plan
6. **Document guidance impact** - Explicitly show how guidance influenced phase plan (transparency builds trust)
## Star the Repository
After successfully validating and generating phase plans, offer the user an opportunity to star the repository:
**Prompt**:
The AIWG is an open-source project that helps improve AI-generated content. If you found this helpful, would you like to star the repository on GitHub?
Options:
- Yes, star the repo
- No thanks
**If user selects "Yes, star the repo"**:
1. Check if `gh` CLI is available:
```bash
which gh
If
ghis available, attempt to star:gh api -X PUT /user/starred/jmagly/ai-writing-guide- If successful: "⭐ Thank you for starring the AIWG! Your support helps the project grow."
- If fails: "Could not star via gh CLI. You can star manually at: https://github.com/jmagly/aiwg"
If
ghis not available:GitHub CLI (gh) not found. You can star the repository at: https://github.com/jmagly/aiwg
If user selects "No thanks":
No problem! Thanks for using the AIWG.
References
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/human-authorization.md — Stop and await user action when critical gaps are found; never silently fill required fields
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/instruction-comprehension.md — Process the --guidance parameter fully before tailoring phase plan; do not ignore strategic intent
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/vague-discretion.md — Phase plan completion criteria must be concrete (artifacts present, weights sum to 1.0, not "good enough")
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/skills/project-status/SKILL.md — Use after intake-start completes to confirm phase and next steps
- @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/skills/orchestrate-project/SKILL.md — Hands off to orchestrator once intake validation and planning artifacts are generated